§ SR-13. Procedure.  


Latest version.
  • The drainage plans must be prepared by a licensed professional engineer in conformance with the design criteria and standards contained herein. These plans shall be submitted in final form, together with the final plat, at least 15 days prior to advertising for the public hearing. The final plat shall not be signed until the drainage plan is approved by the Engineer.